C.I.R.A. Costruzioni Restauro Monumentale Srl

(Civil constructions and monumental restoration - project sheets in italian)

GTA Srl- Geologia Tecnologia Ambiente

(Environmental engineering)

  • Rome Underground "Line C" Trunks T4-T5-T6 and T7 (environmental components of the construction sites)
  • “Risorse per Roma” Rome Underground "Line C" Trunk T1 and variant connection with “Trunk C2”
  • Municipality of Verona: SS62 “Cisa” – Villafranca (highway)
  • Proger: Preliminary draft project – Connection of SS434 – Basso Acquar–Verona (highway)
  • Ing. Boneddu: Road access to Olbia Airport “Costa Smeralda” – Preliminary draft project (E.I.A.)
  • Integra Consortium: SS 106 “Jonica” – New roadway modernization works - Trunk: Reggio Calabria–Bova–Megalotto 5 (E.I.A.)
  • Infratec/SRDigital: New SS341 “Gallaratese” – Trunk: Somarte near the Province of Novara – North section (E.I.A.)
  • Tecno Engineering 2C: Lampedusa Airport(AG) - Airport development plan (E.I.A.)
  • Tecno Engineering 2C: Crotone Airport – Airport development plan (E.I.A.)
  • Proger: Area Plan S. Pietro train station, Via del Crocefisso – Roma, Final design of the underground multi-storey car park (E.I.A)
  • Bonifica della Sardegna Centrale Consortium: Expansion of the reservoir of the Maccheronis dam on the Posada River (E.I.A.)
  • Torre/Rigata: Urban planning program for the construction of the settlement “La Torretta” (RM) (E.I.A.)
  • Pedemontana of the Roman Castles highway - Environmental pre-feasibility study and preliminary design of environmental mitigation interventions and landscape insertion
  • SS 106 “Jonica” highway – Modernization works in new section of the Trunk Reggio Calabria – Bova – Megalotto 5 – Integrations requested by the Ministry of the Environment, the Ministry of Cultural and Environmental Heritage and the Calabria Region.
  • Preliminary draft project, environmental impact assessment, archaeological study, transport study and analysis of the costs and benefits of the Salerno-Potenza-Bari itinerary in the Trunk between the SS407 and the Altamura variant
  • Final design: Road access to Olbia Airport “Costa Smeralda”
  • Municipality of Capua: Roma-Cassino-Napoli railway line - Trunks between km 203+700 and km 205+100.Study for acoustic restoration
  • Rome Underground "Line C": Final design of the compensatory works Trunks T5, T6a, T7 (RM)
  • Rome Underground: line extension of the Trunk Anagnina - light train line in the Trunk Anagnina-Torre Angela – Noise, Vibrations and Atmosphere components
  • Rome Underground "Line C" – Trunks T6a and T7 - "Depositi Graniti" - Project for the environmental insertion of the construction site, preservation of existing buildings, integrated pollution control, restoration of sites, environmental monitoring project
  • Final design during the tender phase of the lines A and C of the Parma Underground. Environmental compatibility study of the proposed design variants, interventions for the environmental insertion of the construction sites and works for the safeguard the pre-existences
  • GEASAR srl: Technical support activities in the airport commission of the Olbia Airport “Costa Smeralda”.
  • Geological and technical study including geognostic surveys for the planning of infrastructural expansion of the Rome "Urbe" Airport (RM).
  • Lampedusa Airport (LICG) – Development plan
  • Acoustic and environmental compatibility study for the "Leonardo da Vinci" airport of Roma – Fiumicino
  • Rome "Urbe" Airport (RM) – Acoustic Environmental Compatibility Study for a new runway with Isophonic curves determination
  • Acoustic Impact Study for ground level helipads for the Augustawestland plant at the "Marco Polo" airport of Venezia-Tessera.
  • Acoustic Impact Study for helipad in the new tourist settlement of Baiaverde in the Municipality of Ospedaletti (IM)
  • Forecasting acoustic impact study on the interventions for the construction of a newhelipad on the building of the S. Maria Nuova hospital (Reggio Emilia)
  • Acoustic Impact Study for helipad on the new headquarter of the Lombardia Region in Milan
  • SKYCAR aircraft: Acoustic Certification (American regulation FAR36 App. G)
  • P68R aircraft: Acoustic Certification (American regulation FAR36 App. G)
  • Noise and vibration measurements on different modules of the anti-aircraft missile system SAMP / T (ME, MLT, SAE)
  • New Commercial Port of Puerto Cabello (Venezuela), environmental pre-feasibility study
  • New Tourist Port “Golfo Aranci” (E.I.A.)
  • 5 MW photovoltaic park in the Municipality of Montalto di Castro (RM)
  • Parco fotovoltaico di 2.6 MW nel Comune di Giuliano di Roma (FR)
  • Two photovoltaic parks of 4.25 MW and 3.75 MW in the Municipality of Francofonte (CT)
  • Two photovoltaic parks of 0.69 MW and 0.88 MW in the Municipality of Francofonte (CT)
  • 1.6 MW photovoltaic park in the Municipality of Guagnano (LE)
  • Wind farm of the Municipality of S.Agata di Puglia (FG)
  • Wind farm of the Municipality of Candela (FG) (E.I.A.)
  • Final design of the Expansion of the reservoir of the Maccheronis dam on the Posada River
  • Underground parking space Farnesina (RM)
  • Acoustic protection on the 3rd lot of the Parmovay-Dimitrograd railway line in Bulgaria
  • Technical Administrative Management between Italferr / Royal Haskoning Netherland

Freyssinet Terra Armata Srl

(Italian subsidiary of "Reinforced Earth©")

Reinforced Earth

  • IRICAV 2 Consortium: Verona – Venezia
  • COGEI Spa: SS 106 Jonica – Castellaneta enlargement
  • Turra Costruzioni Edili: River walls for industrial complex
  • Tinarelli: emergency parking areas: Modena - Brennero
  • SS 554 – Cagliari: ring raod walls
  • Cassino – S. Vittore: final design for tender
  • Napoli – Potenza: railway level crossing suppression
  • Torno Spa: Nocera Umbra Sud junction
  • Italstrade Spa: tunnel under Via Olimpica near Villa Pamphili
  • C.M.C.: Parking area
  • Astaldi Spa: Kom Valley Viaducts – viaduct walls
  • Comedile: sports facility
  • Cariboni-Versaci: Lot 23 Excerpt I
  • Tecncostruzioni: SSV Rieti-Torano highway
  • Impregilo: SS 80 Teramo - Giulianova highway
  • Later Inerti Spa: Plant wall
  • Secol/Coestra/Asfalti Sintex: S.G.C. Grosseto – Fano and Grosseto - Siena highway
  • G.R.A. Roma III^ lane enlargement for highway (tender procedure and parts of constructive project)
  • Fredrea Sa: Komotini – border of Bulgaria highway
  • Ruggeri: Via Angelo Emo – Via Anastasio (RM)
  • Fredra Sa: Egnatia Odos – Loc. Mbafra (Greece) / Skaramaga (Atene) / Sloniki highway
  • Toto/Grandi Lavori/A.I.Erre: SA-RC highway: Trunks I, II e III (various final design)
  • Coestra/Salini: Siena – Bettolle highway
  • Coopcostruttori/Coop Sette: "Asse viario Cispadano" highway
  • Kraton – Akrata road
  • SAPTA: Voie Ferree RN40 / RN45 / RN6 – Pont oued Saida
  • Cepav Uno: TAV MI-BO highway
  • Freyssinet Hellas: Egnati – Odos
  • Astaldi Spa: Ankara – Gerede – Gumusova highway
  • Campione D’Italia Casino – Embankment walls

TerraTrel

(welded wire mesh)

  • Tinarelli Spa: emergency parking areas in Terratrel
  • Mancini: Concrete mixing plant
  • C.M.C.: Parking area
  • Rocksoil/Ferrovial: Tunnel entry at Nazzano – A1 highway
  • Tecncostruzioni: Rieti-Torano highway
  • Alissa Costruzioni: parking areas in Terratrel
  • Secol/Coestra/Asfalti Sintex: S.G.C. Grosseto – Fano and Grosseto Siena highway
  • Edilbaldo Spa: Roncafort (TN) side walls and railway bridges
  • Roma – Fiumicino highway enlargement (tender procedure and final design)
  • G.R.A. Roma III^ lane enlargement for highway (tender procedure and parts of constructive project)
  • NATO base of Sigonella
  • Fredra Sa: Egnatia Odos – Loc. Mbafra (Gracia) / Skaramaga (Atene) / Sloniki highway
  • Coestra/Salini: Siena – Bettolle highway
  • Coopcostruttori/Coop Sette: "Asse viario Cispadano" highway
  • Bonifiche Valle D’Aosta: Cumuli Buthier: safety measuress
  • Turin-Lyon: Morgex tunnels

Muro Verde

(concrete precast ecological wall)

  • Belli: walls under concrete bridge abutment – Guardiagrele
  • Talea e Tardito: retaining wall
  • Cariboni-Versaci: Lot 23 Excerpt I
  • Itinera Spa: SS 30 Loc. Borgoratto highway(AL)
  • Coopcostruttori Scarl: retaining wall at Pianoro (BO)
  • G.R.A. Roma III^ lane enlargement for highway (tender procedure and parts of constructive project)
  • Torno: Monte Bianco highway: Morgex tunnel

Techspan

(precast arches)

  • Rocksoil/Ferrovial: Tunnel entry at Nazzano – A1 highway
  • Astaldi Spa: transparent embankment – Ravenna

CMP - Costruzioni Manufatti Prefabbricati Srl

(precasting plant)

After a brief experience as a draftsman at the technical office of the following engineering companies: S.C.A.F. S.p.a., Edilcor S.r.l. and S.A.M.O.S. S.r.l. with tasks of drawing, design and construction site accounting for road infrasctructure projects of consolidation in foundation, cortical strengthening of rocky walls, consolidation of civil structures and tunnels. In 1989 I was transferred definitively to CMP S.r.l. as manager of the production and prefabrication, purchases, logistics, design of prefabricated walls (“cribb walls”)with the exclusion of static checks. During this period, as responsible for the development of new technologies, I created and filed a patent (industrial model) for prefabricated vibrated reinforced concrete support and cladding structures with inventor appointed by myself and the owner of the S.C.A.F. S.p.a., which was the basis of the company's production until 1994.

Cribb wall patent (italian)